Villa Renovation in Dubai

From Palm Jumeirah and Emirates Hills to Arabian Ranches, Seven Jaguar Interior Decoration LLC delivers complete villa renovations — civil works, MEP, false ceiling, flooring, joinery and premium finishing — on time, with zero compromise on quality.

Complete Villa
Renovation Scope

01
Civil & Structural Works

Demolition, partition changes, plastering and structural modifications carried out to approved drawings and engineer's instructions.

02
MEP (Electrical, Plumbing, AC)

Full re-wiring, lighting circuits, plumbing re-routing and HVAC works delivered to Dubai authority standards.

03
False Ceiling & Lighting

Gypsum and bespoke ceiling designs with cove, spot and feature lighting that transform every room.

04
Flooring

Marble, porcelain, engineered wood and large-format tiles supplied and installed to a flawless finish.

05
Joinery & Wardrobes

Custom wardrobes, kitchens, vanities and cabinetry built to your exact specifications and space.

06
Painting & Finishing

Premium paints, textured feature walls, snagging and a detailed handover — ready to move in.

Villa Renovation
Cost in Dubai

Every villa is different, so final pricing is confirmed only after a site visit. As a guide, villa renovation in Dubai typically falls in these ranges:

Refresh / Partial — from AED 350/sqftPainting, flooring, lighting and select joinery upgrades.
Mid-Range Full Renovation — AED 500–700/sqftCivil, MEP, ceilings, flooring and custom joinery throughout.
High-End / Luxury — AED 900+/sqftPremium materials, bespoke design and smart-home integration.

Figures are indicative only. A precise quotation is issued after a physical site assessment.

Villa Renovation
Questions

How much does a villa renovation cost in Dubai?

Typically AED 350–900+ per sqft depending on scope and finish. A 3,000 sqft partial renovation often starts near AED 150,000; a full luxury renovation can exceed AED 1,000,000. Exact pricing follows a site visit.

How long does a villa renovation take?

Most villa projects complete in 6–12 weeks; smaller fit-out and refresh works in 3–5 weeks, subject to scope, approvals and material lead times.

Do you handle Dubai authority approvals?

Yes — we coordinate the required approvals and NOCs with the relevant Dubai authorities and community developers as part of the scope.